AndersonCivil Consultants Inc. offers:

  • Storm system feasibility studies
  • Computer analysis
  • Integrated Stormwater Management studies and conceptual design
  • Design of storm drainage piped systems
  • Design of detention ponds and flow control structures
  • Fish passage structure and habitat enhancement

Following are examples of Rainwater Management clients and projects completed by our staff.

CITY OF NANAIMO
Walley Creek integrated stormwater management planning study, including consultation with stakeholder groups, public process and implementation plan.

CITY OF NANAIMO
Subconsultant for Wexford Creek integrated stormwater management planning study.

REGIONAL DISTRICT OF COMOX-STRATHCONA
Computer modelling of storm drainage for Lazo Drain / Queen’s Ditch stormwater plan.

VILLAGE OF CUMBERLAND
Detailed study of the Northern Upland and Southern Upland and Urban Areas peak and long-term runoff to advance the wetland concept and provide design criteria for sizing of a constructed wetland.

CITY OF NANAIMO
Harbourfront Theatre and Parkade - detailed study of piped and overland flows, design of major storm drain below tide level and with marine discharge.

CITY OF NANAIMO
Runoff determination for urban catchment area; stormwater management design including evaluation and design of storm sewer outfall for alternative construction materials.

MINISTRY OF TRANSPORTATION AND HIGHWAYS
Deep Bay - runoff determination and design of storm sewer outfall and bank erosion repair.

MINISTRY OF TRANSPORTATION AND HIGHWAYS
Highway drainage study in conjunction with predesign study of 7 km highway realignment between Port McNeill and Port Hardy, including major culverts in fish bearing creeks.

CITY OF NANAIMO, Harewood Dams
Repair of rock and earth-fill dams including spillways and pipework.

CITY OF NANAIMO
River basin studies and runoff determination for both urban and rural catchment areas; stormwater management design for urban catchments including evaluation and design of detention ponds, detailed design and construction of trunk storm sewers.

THE HIGHLANDS, Langford, BC
Storm drainage study and report for development of 1100 acres to 1 and 2 acre lots, townhouses and common areas, including assessment of detention pond requirements.

NORTH CEDAR IMPROVEMENT DISTRICT
Riverbank erosion study design, permits and construction supervision of bank stability works on Nanaimo River.